Showing posts with label Army base. Show all posts
Showing posts with label Army base. Show all posts

Thursday, June 10, 2010

Joe Lieberman, Jodi Rell to Speak at Army Base Ground-Breaking Ceremony

The Army Reserve will be hosting a ground-breaking ceremony on Friday, at 11 A.M, for the Armed Forces Reserve Center being built in the former Cucia Park on Smith Street. Senator Lieberman, Congresswoman Rosa DeLauro, Governor Jodi Rell, and Mayor Seb Giuliano will speak at the event.

The $54M AFRC is a result of Federal legislation which mandated that the Army Corps of Engineers build a military training site in Middletown. The Cucia Park site was selected after a year of engagement between the Army Corps of Engineers and Middletown residents. After two aborted site selections, Mayor Giuliano convened a panel which included Council members Ron Klattenberg and Phil Pessina and several other city residents (disclosure: I was one of them). The Mayor's panel recommended Cucia Park for the Army base, and after extensive review, the Corps of Engineers agreed.

DeLauro, Attorney General Richard Blumenthal, Secretary of State Susan Bysiewicz, State Senator Paul Doyle, and State Legislators Gail Hamm and Ray Kalinowski participated in discussions with the Army about their site selection. Many of them are likely to attend the ground-breaking ceremony, along with others such as Joe Serra and Matt Lesser.

The actual ground-breaking began a few weeks ago, when DeRita Construction and KBE Building Corporation began to level the land for construction.


Tuesday, April 20, 2010

Army Unveils Training Facility, Plan to Protect Boardman Lane From Development


Boardman Lane Land to be Preserved by the Army
Pedro Wasmer, representing the group which owns 88 acres on Boardman Lane in Westfield, announced at the Westfield Residents Association quarterly meeting that he had reached an agreement to sell the majority of his land to the Army Corps of Engineers. He said that he wanted to subdivide the land into a 4.6 acre parcel which would include the historic farm and a 52 acre parcel which the Army would purchase, "We are very pleased to keep the land pristine." The sales price for the 52 acres is $1.4M. The remaining acreage is all unbuildable wetlands, except for a 1.6 acre parcel on Boardman Lane, and "less than 8" acres which are not accessible except through the neighboring property owned by Yellow Freight, Wasmer said they have no plans for the remaining land.

Diane McCartin, lead planner for the Armed Forces Reserve Center to be built at Cucia Park, said that the Army has held several working meetings with the Middlesex Land Trust, to transfer ownership of the 52 acres to the Land Trust, "The Army does not prefer to own it in perpetuity." She praised the Land Trust as a local land preservation organization, however, she said that there were federal laws which complicated the possible transfer of land. She was unsure what the long-term ownership of the land would be. McCartin said that under any circumstances the land would have permanent protection from development, written into the deed.

Dennis Lowry, wetlands specialist at the Corps of Engineers, explained that the 52 acres was being preserved to replace the function of 1.6 acres of wetlands to be destroyed at Cucia Park when the Armed Forces Reserve Center is built. He highlighted the efforts they would be undertaking to improve habitat for the Eastern Box Turtle, which include tight regulations on the time of mowing and the height of the blades on the mower. He also said there was a plan for removal of invasive species, and plantings of native trees such as pin oaks and cottonwoods.

The assembled WRA members applauded the outcome for the Boardman Lane land, and thanked Wasmer and McCartin for making it possible. Also in attendance was Council member Ron Klattenberg; speaking for the Mayor's Advisory Panel, which worked to steer the Army towards Cucia Park, Klattenberg said, "This is a dream come true."

The Armed Forces Center Plans
Jim Culkin, of KBE Building Corporation, presented the site plan and schematic of the $51.5M Armed Forces Reserve Center at the former Cucia Park. The complex will include a main building of 160,000 square feet, a storage building of 34,000 square feet, and a large parking lot.

Culkin highlighted the environmental features of the site plan and building, which is being built to achieve a "Silver" under the LEED process of certifying environmentally responsible construction. Storm water run-off will be handled by a series of bioretention basins, galleys below parking structures, and gentle slopes of vegetation to reduce erosion caused by water run-off from the adjacent I91. The building will have a solar water heater, solar power panels, a 'green roof' covered in low-maintenance plants, and be constructed partially with recycled materials.

McCartin said that the site plan would not be reviewed by the City's Inland Wetlands or Planning and Zoning Commission, but sighed that the review done by the Corps of Engineers environmental division and the EPA was extraordinarily thorough.

The ceremonial ground-breaking for the facility will take place on June 10th, although preliminary site work is beginning this week. Occupancy of the facility must take place by September of 2011, according to Federal Law.

-------
Disclosure: I am vice-chair of the WRA, and played an active role in the efforts to influence the Army's site selection process.

Friday, March 19, 2010

Luxury Home Builder Interested in Boardman Lane Property, and So Is The Army



The luxury home builder Toll Brothers has expressed an interest in purchasing the 88 acres on Boardman Lane formerly chosen by the Army Corps of Engineers for their military base. They have entered into discussions with the landowner, and presented preliminary plans to city officials, according to City Planner Bill Warner.

The land is currently zoned for Interstate Trade, and would have to be re-zoned to allow a housing development. Warner said to me that both he and Mayor Giuliano told Toll Brothers that they would need to obtain the support of the Westfield Residents Association (WRA) before the city would consider re-zoning. Toll Brothers has not contacted the WRA.

In July of 2008, the Army announced that they had selected this parcel to build an Army Reserve Training Facility. Following community outrage, especially on the part of the WRA, the army backed away from Boardman Lane. One of the concerns of neighbors was the effect of a large training facility on wetlands. To stop development of the Boardman Lane property, the city offered to the Army the little-used Cucia Park, which is surrounded by I91 and industrial land, less than half a mile from the Boardman Lane property. The Army has selected a contractor to build the base on the Cucia Park site.

Ironically, the Boardman Lane parcel is being looked at again by the Army, according to Warner. This time, however, their goal is to perserve it for wetlands protection and habitat enhancement. The construction plans for the facility in Cucia Park require a permit for the destruction of a small amount of wetlands, and the Corps of Engineers environmental division has insisted that the Army mitigate nearby wetlands in order to obtain the necessary 404 permit.

The Boardman Lane property contains wetlands in the same local watershed as Cucia Park, and is still for sale. These features make it an ideal site for mitigation.

Diane McCartin, the project manager for the Reserve Training Facility, confirmed that the Army is talking with the land ownership group, represented by Pedro Wasmer, "We are both interested in preserving the land as much as possible." McCartin said that if the Army bought the land, it remained to be determined whether the Army would retain ownership of the land for the long term, or turn it over to a separate agency of the government or to a private land preservation organization.

She indicated that the land would be permanently protected, with deed restrictions that would not only prohibit development, but would also require ten years of monitoring, removal of invasive species, and enhancement and maintenance of habitat for the Eastern Box turtle.
--------------
Disclosure: I am vice-chair of the WRA executive committee.

Friday, October 16, 2009

Army Spins a Contract

This is what a U.S. Army press release looks like:
__________________
LOUISVILLE, KY – The U. S. Army Corps of Engineers awarded a $51.5 million contract to KBE Ventures, A Joint Venture of KBE Building Corporation & Derita Construction Co., Inc., of Farmington, Conn., for construction of the Middletown Armed Forces Reserve Center at Cucia Park in the City of Middletown, Conn.

The contract award emphasizes what can be accomplished when residents, community and congressional leaders and the Army work together. “I want to thank the Middletown, Connecticut and congressional leadership for their partnership to bring this project to fruition,” said Col. Keith Landry, Commander and District Engineer, Louisville District U.S. Army Corps of Engineers. “Most importantly, a big thanks to the Middletown residents who offered their invaluable support and input into the process. We could not have awarded this contract without all of the community support.”

Middletown Mayor Sebastian N. Giuliano agreed with Col. Landry regarding the active input of the City’s residents.

“I think the whole process was enhanced by the active and passionate involvement of our citizens, those that were immediately impacted and those that weren’t. I think the City’s citizen Army Base Advisory Panel and the work of our Planning Office can be models on how something like this can work and the communications level necessary between a local municipality and the Army. I also give credit to the Army for their willingness to listen to our needs, concerns and issues and their willingness to include those thoughts into site selection and now construction. Middletown will welcome the Army to town,” said Giuliano.

The contract includes construction of a 164,000 square-foot training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for four Army Reserve units and six Connecticut Army National Guard units.

M. Jodi Rell, Governor of the State of Connecticut stated, “Today’s announcement regarding construction award of the Middletown Armed Forces Reserve Center, signifies we have cleared yet another critical gate in the process of delivering this project for Soldiers in our Connecticut National Guard. Although several gates still remain I am encouraged by the collaborative manner with which the Corps, the city and the many stakeholders are now working to make this sorely needed project happen.”

The 42-acre park is zoned industrial. The reserve center support facilities include a 35,000 square-foot Organizational Maintenance Shop and a 3,886 square-foot unheated storage building. In addition, the contract includes associated parking areas, walkways and access roads. Approximately 100 full-time personnel are expected to use the campus.

“I am pleased that the Army is moving forward on the Cucia Park site, and balancing the needs of the community with those of Connecticut men and women who serve in the Army Reserve and National Guard,” Rep. Rosa L. DeLauro said. “Today’s announcement is the direct result of the Army ultimately listening to the concerns of the city and its residents to ensure that a mutually agreeable site was selected. I believe the Center will provide both a much needed new home for Connecticut’s Guard and Reservists and benefits for our community at large, and I will continue to work with the Army, the city and the Middletown community to ensure proper development of the site.”

“This marks a proud occasion not only for the citizens of Middletown, but also for those who serve so proudly in the Connecticut National Guard and the Reserves," said Sen. Joe Lieberman. "This state of the art facility will provide our brave service members with greatly improved training and quality of life, making them better prepared to defend our country."

The reserve campus is proposed to be built at a former industrial site currently known as the Cucia Park on Smith Street in Middletown. The U.S. Army Reserves 99th Regional Support Command has applied for a permit under Section 404 of the Clean Water Act from the New England District U.S. Army Corps of Engineers. The Corps issued a public notice on Aug. 11, 2009, and is currently reviewing the application in collaboration with Federal resource agencies. The Corps will issue, deny, or issue with special conditions, a permit for the Cucia Park site.
----------------------

Saturday, August 22, 2009

Army Seeks Wetlands Permit

As I was browsing through a stack of unread Hartford Courant papers this week, I stumbled across a small article (in the Aug. 13th paper) detailing the Army Corps of Engineers' application for a permit to fill wetlands in Cucia Park. The Courant picked up the story from the Middletown Press, and I thought it worth it to reprint that story (click here to go to the original MP story):

By SLOAN BREWSTER, Press staff

MIDDLETOWN — The U.S. Army Reserve is seeking a permit to
fill wetlands at Cucia Park. The federal permit from the U.S. Army Corps
of Engineers is part of the Clean Water Act, and one of the legal hurdles the
military must jump in its plans to build an army reserve training center on
the 42-acre park on Smith Street. In July, Mayor Sebastian N. Giuliano
signed the contract for the $2 million sale of the park. Now he is waiting
for the money, he said Tuesday. According to the contract, the military has
until the end of the fiscal year to pay. Last month at the Crowne Plaza
Hotel in Cromwell, the buyers held a preconstruction meeting with
contractors that might be interested in building the proposed facility, the
mayor said. Construction on the three-story, 164,007-square-foot facility on
17 acres of the park will not begin until the permit is issued, said Todd
Hornback, Corps spokesman for the Louisville District. “Once the permit goes
through, we can finalize the contract,” Hornback said. The permit will limit
what can be done on the wetlands, said Larry Rosenberg, corps chief of
public affairs for the New England District. “We have to gain that permit to
see what mitigation [allows], and how much can we fill,” he explained. In
order to make such determinations, the corps must evaluate the construction
plans and consider the impact to the wetlands, Rosenberg said. “Our goal is
always net loss zero,” Rosenberg said. “The only thing that we issue a
permit on is the least damaging practicable alternative. This is a public
trust; we are charged by congress to not impact on the environment
negatively.” There have already been changes to the plans for the wetlands,
Hornback and Rosenberg said, specifying that the amount to be filled has
been decreased. Neither spokesman knew the exact specifications of the
changes, they said. The permit can be denied, issued or issued with
conditions, Rosenberg said, adding that 99 percent of such permits are
issued with conditions. The training center is a response to the 2005 Base
Realignment and Closure Act, which mandates smaller individual reserve bases be closed and replaced with larger combined locations where reservists train on alternate weekends. There is a 30-day period during which the public may file comments or request a public hearing on the permit review. Public comments must be filed no later than Sept. 11, to the U.S. Army Corps of
Engineers, New England District, Regulatory Division, (attn: Cori Rose) 696
Virginia Road, Concord, MA 01742-2751, or e-mail
cori.m.rose@usace.army.mil.

I was traveling for most of July, so I missed this news completely. Interestingly, the print Courant article reported that the City of Middletown has already received monies (I think it said $100,000, but I recycled the paper yesterday before I thought about publishing this article, so I could be wrong) that it can keep whether the purchase of Cucia Park goes through or not; this same information was NOT in the online version. If anyone knows more about this, please post an update comment!

Tuesday, May 12, 2009

EDC Votes for Cucia Appraisal

After an executive session to discuss the Army's offer for Cucia Park, the Economic Development Committee voted to conduct an independent appraisal to determine how to negotiate with the Army.

Wednesday, March 18, 2009

Army base report delayed

The Army Corps of Engineers has told the City that the report on their selection of a site for the Armed Forces Reserve Training Facility will not be released this week as originally planned. The release is now expected to happen in approximately the 1st week of April.

Three Westfield sites are being considered by the Army for the training facility: a historic farm on Boardman Lane, an industrial park development on Middle Street, and the city-owned Cucia Park on Smith Street. Westfield Residents, as well as many others in the city, strongly opposed the siting of an Army base on Boardman Lane. Mayor Giuliano convened an advisory panel, led by Ron Klattenberg and consisting largely of Westfield residents, to work with the Army to select a site.

The mayor's advisory panel rejected both the Boardman Lane and the Middle Street sites, and endorsed the sale of Cucia Park to the army for their base. The army did not accept these recommendations, and instead continued to view Boardman Land and Middle Streets for their facility. With a view towards blocking the army from taking prime industrial land, the Common Council approved an offer of city funds to provide tax relief and to purchase land in the industrial park, which is owned by Ted Bysiewicz. This week the Council voted to extend the deadline for this offer.

Last summer and fall, the Army held a series of public hearings in an attempt work with the community on the site selection. The ranking of the sites was to be released in October, but in a meeting on November 10th, the Corps of Engineers announced that they would instead conduct a full environmental assessment on all of the sites. This environmental assessment is to include plant and animal surveys, geotechnical boring, archeological, economic, other studies.

The City is now awaiting the release of the reports on Environmental Assessment (EA), and a Draft Finding of No Significant Impace (FNSI). These will indicate which of the sites the Army views as most favorable for its military training facility. Following the release of those reports, there will be a mandated 30 day period of public comment.

Disclosure: I am on the Mayor's advisory panel.

Tuesday, November 11, 2008

I can't take it anymore...


Thank you, Mr. Fishmuscle, for your summary of the "lamest press conference in the history of the planet." Let me remind all the readers that our tax dollars paid for a wasted day's worth of effort of at least 5 elected officials, their staff members, and the travel costs and per diem for at least 6 army peoples. OK. To review what we learned yesterday:

um......hmm....let me see...wait, I have to check my notes from last time....what were we supposed to learn today? Let's review the record so far:

Middletown Press, August 27
"Ultimately in about the end of October [we intend] to have a site selected," Dale said.

Courant, September 18
"The Corps has until the end of October to select a final site."

Courant, September 21
"Sometime next month, each of the sites will be ranked, clearing the way for an environmental review and final site selection by Oct. 30."

The Army's September 30th PowerPoint presentation:
"Early November–Release ranked sites; NEPA and real estate process continues"

Middletown Eye News, September 30 (http://middletowneyenews.blogspot.com/2008/09/no-wonder-democracy-is-hard-sell.html)
"The Army will rank these four sites in order of preference to create a Site Identification Report that will be forwarded for approval by 17 October. By October 30th, this list of sites will be approved, and the NEPA process will begin for each site. In early November, the Army will release the site rank order,..."

Middletown Press, posted online September 30
"The corps plans to announce its preferred site in early November and then begin a National Environmental Policy Act review process, said David Dale, deputy district engineer of the Louisville District of the Army Corps of Engineers."

Courant Article, October 1
"By late October or early November, each of the sites will be ranked, clearing the way for an environmental review."

Colonel Landry's October 6 letter to the editor of The Middletown Press:
"As the NEPA environmental assessment continues, I expect the Army to release the "Site Rankings" in November." AND "I look forward to returning to Middletown in the near future to release the Army's ranking of the four proposed sites."

Wait…I count at least 8 different WRITTEN places where the good-natured, gentle and oh-so-patient residents of the great town of Middletown were told that something important and news-worthy would happen by the very beginning of November. OK, so if you want to argue that you can’t trust the media to get the story straight (an argument I’ve heard VERY recently), there are still TWO Army-generated sources that verify the SIX written media stories about a site ranking process and the release of those results by November 2008.

So, after all that hot air blowing, the Army one again sends the good Col. Landry back to Middletown to flash his winning smile and his snazzy uniform (plus charming accent) to do…what? He came all 862.88 miles (Mapquest, town center to town center) to tell us that all 3 sites are getting the “full-blown NEPA analysis? WAIT…let’s review again:

When the Army picked the Maromas site the first time (was it just Jan or Feb? It seems like forever ago…), it was announced as the “preferred site” that would then undergo NEPA analysis. Lots of people complained and the State threatened to buy the land out from underneath the Army.

Then, in June, the Army picked Boardman Lane as its “preferred site” and announced that NEPA analysis would begin. EVEN MORE PEOPLE COMPLAINED, and local, state and federal elected officials got involved. Gov. Rell shrunk the property size requirement for the base location by pulling out the 250th Engineering Unit, and Col. Landry visited the first time to tell us all that the site selection process was beginning anew in an “open and collaborative fashion.”

LOTS of time and effort went into telling the Army we thought (the we here is the Mayor, his advisory counsel, local, state and federal elected officials, the Courant’s editorial board, Joe and Jane Average Middletown Resident, all the blog contributors, the Middletown Eye News, the Middletown Press, and sorry-if-I-forgot-to-mention-you-too-whoever-you-are who participated as well). We attended the meetings. We posted blogs. We wrote letters and email to our elected officials. We twiddled our thumbs all through October, wondering if we could really trust that our efforts would give us a happy ending by early November.

Now we hear that the Office of the Assistant Chief of Staff for Installation Management has decided to pursue all three remaining sites. Yes, Mile Lane was excused because the lawyers could properly read the sentence that says: “Close the US Army Reserve Center, Middletown, CT, ... and relocate units to a new Armed Forces Reserve Center ... in Middletown, CT, if the Army is able to acquire land suitable for the construction of the facilities.” WAIT. I guess they can only read the first ½ of that sentence correctly. Shoot. I thought we had something there…

WHY oh WHY must we suffer such torture? Congresswoman DeLauro’s favorite saying lately is “Trust, but verify.” I’m sorry, Congresswoman, but I think you need a new saying. The verification part obviously hasn’t worked out, which makes me doubt the trust part. Just what are we supposed to trust? The Colonel believes the Army is going to make the right decision? What decision exactly is he referring to? The Army boldly strode into town (think bad-guy Western music here), picked (on its own) about the two most sensitive and pristine locations Middletown has, and now claims it can’t make a decision until all three remaining sites are NEPA’d?

The only possible reason I can think of that all 3 sites are undergoing a very expensive and time-intensive process is so that if the Army picks the wrong site AGAIN, it has two other chances to try again without having to go back to the drawing board and blow its construction schedule (and this doesn’t even begin to consider the number of possible location choices should the Attorney General prevail on his interpretation of “if”).

Yet, silly me, I just can’t understand how or why the Army could mess up the site selection process a THIRD time? Didn’t the new “open and collaborative” process work? Did we the people stutter or something? Perhaps we were unclear in our feedback about where we think the Army should go (hey now, I know what some of you are thinking, and that’s not patriotic…).

WAIT!!! I think I’ve got it!!! I know what happened!!! You know when you tell your kids NOT to do something, and they’re really not paying all that much attention, and so what their brain fixes on is what you told them, but they didn’t actually hear the NOT part…? Let’s review what I mean in the context of our current situation:

Us (the Mayor, his advisory counsel, local, state and federal elected officials, the Courant’s editorial board, Joe and Jane Average Middletown Resident, all the blog contributors, the Middletown Eye News, the Middletown Press, and sorry-if-I-forgot-to-mention-you-too-whoever-you-are who participated as well): “We don’t want an Army Reserve Training Facility on Boardman Lane.”

Army: “Hey! Middletown wants us to put the Army Reserve Training Facility on Boardman Lane!”

Us: “No! Aren’t you listening? The BRAC language says IF suitable land can be found in Middletown, and Gov. Rell reduced the base size requirement, so FIND ANOTHER LOCATION because Boardman Lane is unsuitable.”

Army: “Hey! Middletown wants us to put the Army Reserve Training Facility on Boardman Lane!”

What we should say from now on: “Put the Army Reserve Training Center in Cucia Park.”

WAIT. Didn’t we say that already?

Monday, November 10, 2008

Contrite Colonel to Community: Trust me

Colonel Landry, commander of the Louisville Division of the Army Corps of Engineers, faced a barrage of criticism of the army from local, state, and federal officials at a press round table event in Middletown on Monday afternoon. The Colonel was in Middletown to make two announcements. First, the Mile Lane site, currently owned by the army, would not be considered any more. The reason for this is that the Base Relocation and Closure (BRAC) Act requires that the Mile Lane facility be closed, the language of BRAC is as follows:
Close the US Army Reserve Center, Middletown, CT, ... and relocate units to a new Armed Forces Reserve Center ... in Middletown, CT, if the Army is able to acquire land suitable for the construction of the facilities. [emphasis mine, some of Blumenthal's comments pertain to this, see below]
Second, Colonel Landry announced that all three of the remaining sites under consideration, Cucia Park, Bysiewicz Industrial Park, and Boardman Lane/Ken Dooley Drive, would be evaluated in equal measure. A final decision on a site will not be made until after completion of Environmental and Engineering Feasibility Studies, including the environmental assessment (EA) done under the National Environmental Policy Act (NEPA). The NEPA process requires 5 months of work, and thus the site selection will not be announced until the end of March 2009.

Colonel Landry opened the event by recalling that when he was last in Middletown, he asked for the community's help in identifying properties, and he told the community that he would return to Middletown in late October or early November with a ranked list of sites. He said that since then, his superiors, in the Office of the Asssistant Chief of Staff for Installation Management (ACSIM, for those of you who have not yet filled your daily acronym quota), had instructed him to pursue all sites, "The Army has ordered me to undertake a full-blown NEPA analysis on all the sites for the project." The Colonel released a memorandum from ACSIM to that effect. In later remarks, the Colonel said that he was sure that the packet on each of the sites fully captured the concerns of elected officials. He further said, "I will go on the record: I am absolutely 100% confident that given all the appropriate analysis the army will make the right decision. It will all be out there and be all on the record."


The Colonel then listened to several elected officials, each of whom blasted the Army for keeping the Boardman Lane site on the list of possible sites. Congresswoman DeLauro said that keeping Boardman Lane on the list "flies in the face of the army paying attention to what we have said." She said that city residents should not have to live with the concern over Boardman Lane for another 5 months, that this was an unnecessary 'agida' for Middletown. In a press release of her own, she said,
"The community’s opinion must have significant weight and be taken into consideration now, not further along in the process. It is as if the Army believes the community, with a few more months time, will change its perspective on the issue, when in fact, resistance will only continue to stiffen."

Attorney General Blumenthal
reiterated his opinion that BRAC does NOT require the army to build their facility in Middletown. He has in the past argued that the BRAC language clearly allows for the facility to be built in other towns if no suitable land is found in Middletown. He also urged that Boardman Lane be "firmly and finally removed, not only because of quality of life, ... but because it will never be acceptable as a site." He made the personal prediction that Boardman Lane as a viable site is dead, because he was confident that the Army COE would follow the law. In response to a question from Middletown Eye reporter Ed McKeon, Blumenthal stated, "If the army chooses Boardman Lane, it is in for a fight, it is in for a hard-fought battle, one that will take years to resolve. That is the basis for my prediction that they will do the right thing." Essentially, Blumenthal was predicting that both for legal and for tactical reasons, the army would retreat from consideration of Boardman Lane.

Secretary of State Bysiewicz expressed her concerns as a taxpayer, "I am distressed that we are spending money on environmental assessments for two properties that are inappropriate." Mayor Giuliano and Councilman Ron Klattenberg, who chaired a citizens advisory panel on the army base siting, both expressed their strong disappointment that the army was not pursuing solely Cucia Park, the site that the city strongly recommended. The mayor said, "the stand the city of Middletown is taking is not unfair to the army, nor is it overly generous."
He pointed out that if a private developer brought forward a proposal for something like this military facility on Boardman, it would never have been approved, while a proposal for the same facility at Cucia would have been approved. State senator Paul Doyle, and state representative Gail Hamm also questioned the colonel on the process for incorporating community input.

After all these comments, the Colonel repeated what he had said at the outset. He understood the officials' concerns, and he had conveyed that information to his superiors. He expressed his confidence that at the end of the process the correct decision will be made. He said that the ACSIM will decide on a site after the NEPA environmental assessment is done, and a 30 day public comment period is over. By the end of May, the Corps will acquire that site, and proceed towards construction.

Most of these elected officials, as well as state representative Joe Serra, and representatives from the offices of Governor Rell, Senator Lieberman, and Senator Dodd had attended an earlier meeting with Colonel Landry. It was clear none of those assembled were pleased with what the Colonel had to say, however, none of them were willing to challenge the integrity of the colonel. Congresswoman DeLauro summed up the feelings in the room by saying of the Army, "Trust, but verify." In her press release,
she said, “The Army will continue to hear from me and the community until the Boardman Lane property is removed as an option for the Armed Forces Reserve Center.”

Friday, November 7, 2008

Army is Miles off

The Army Site selection process has inched forward one step, unfortunately it is not the step that Middletown residents were led to expect as part of the Army's open and collaborative site selection process.

Two sources have indicated that the Army Corps of Engineers will no longer be considering the Mile Lane site, which is currently owned by the army, for their proposed Armed Forces Reserve training center. Mile Lane was removed from consideration after Army lawyers determined that the language of the Base Relocation and Closure Act of 2005 (BRAC2005) required that the Mile Lane site be sold.

Meanwhile, the army continues to pursue 3 other sites for the Military training facility, all in the same Westfield area. One of these sites, Boardman Lane, has been roundly condemned as unsuitable by Middletown residents, and by officials at all levels of the government.

Congresswoman Rosa DeLauro spoke with the commander of the Louisville Army Corps on Friday, and issued a statement expressing consternation that the Boardman Lane property is still being considered. She indicated that the process that they are now following did not appear to be a collaborative one, saying, "I reinforced with him that by keeping Boardman Lane as an option they will not only continue to face stiff resistance, but also breed mistrust with the community. Additionally, its presence is likely to further reinforce the public's skepticism over this process, as well as the weight and value the Army places on the feedback from the community."


Members of the Louisville Division of the
Army Corps of Engineers, including its commander, Keith Landry, will be in Middletown on Monday to discuss the status of their site selection process with Congresswoman DeLauro, Governor Rell, and other elected officials. This discussion will apparently not include a release of the ranking of the remaining sites, as promised by Colonel Landry and others on several occasions. In a letter to the editor published in the Middletown Press on October 6, Colonel Landry gave his word that the ranking would be released, "I expect the Army to release the "Site Rankings" in November. ... I look forward to returning to Middletown in the near future to release the Army's ranking of the four proposed sites." This was consistent with the statements of the civilian head of the Louisville Division, David Dale, who was quoted in the August 27th edition of the Middletown Press, "Ultimately in about the end of October [we intend] to have a site selected." Colonel Landry is sure to be asked on Monday to justify why he is unable to keep his word that the site selection would be an open one.

The Army Corps of Engineers will host a Press round table at the Inn at Middletown on Monday, November 10th, at 3:00PM. Colonel Landry will give a statement and then answer questions from the Media. The Corps will also release the comments they
received from the Pentagon's Army Chief of
Installation Management on the proposed sites and their decisions on the path
forward.

Wednesday, November 5, 2008

Army to return to town without site ranking

The last time that the Army Corps of Engineers were in Middletown, they held a public hearing to get community input on 4 sites they were considering for an armed forces reserve training center. At this meeting, which occurred September 30th (coverage in the Eye), the time line that they announced for site selection included the following (from their PowerPoint presentation, available HERE):
*17 October - Complete Draft Site Identification Report and forward for approval
*Early November - Release ranked sites; NEPA and real estate process continues
*March 2009 - Contract ready to advertise
*June 2009 - Contract Award
In a call with Diane McCartin (Middletown AFRC project manager) and Ron Elliot (ACE public affairs specialist) today, I asked whether they had made any progress towards the release of ranked sites. To my surprise, Ms. McCartin told me, "I don't believe there is a ranked list of sites." Apparently, no such ranking will be determined until next March or April, when the draft Environmental Assessment will be made available to the public for a 30 day comment period.

In the standard procedure for site selection, the Corps and the clients for the facility (in this case the Guard and Reserve) submit a draft report to a general at the Pentagon. He then responds with a letter to the Corps, in which he approves, disapproves, or requests modifications to the report; this letter essentially provides commands to the Corps for how to proceed with planning for the facility. McCartin and Elliot could not tell me anything about the report that was scheduled to be submitted on October 17th, nor could they say what they expected to hear from the general.

However, the Army Corps will return to Middletown on Monday, November 10th, for a Press event. Mr. Elliot indicated that Colonel Keith Landry, commander of the Louisville District of the Corps, would be joining the civilian staff from the Corps at this press event. Its purpose is to "tell people exactly where we're at in the process [of choosing a site]," according to Mr. Elliot. A media advisory will be sent out on Friday to announce the time, location, and format (press release or press conference) for the event. Neither Mr. Elliot nor Ms. McCartin could be specific about what sort of information would be provided that was not already provided in previous meetings and press conferences.

Ron Klattenberg, councilman and liaison from the city to the Army Corps of Engineers, told me this evening he had received no inkling that the Corps would be coming to Middletown next week. Upon hearing the news of Monday's press event, he said, "It shocks me that the information [about the press event] would come through the media, and not through communications with the mayor." In addition, he said the army had indicated on multiple occasions that they would release the rankings of the sites in early November, and he was outraged at their apparent change of heart.

During the past month, Army consultants have been very busy evaluating the 4 sites under consideration, according to Ms. McCartin. Cultural resources surveys by archeologists, traffic analyses, and wetland surveys are being done on the Bysiewicz Industrial Park, Cucia Park, and Boardman Lane/Ken Dooley Drive parcels. Threatened and endangered species are being looked at on the Bysiewicz and Boardman properties. These studies are either completed, underway, or will be completed in the near future. Ms. McCartin told me that since the Mile Lane property is already owned and operated by the army, their knowledge of that site was extensive enough to preclude the need for additional studies. She said that all of the sites are being given equal consideration, both for the NEPA process and the preliminary development of site plans and building footprints.

Tuesday, September 30, 2008

No wonder democracy is a hard sell...

Given the events of the last few weeks, I'm beginning to understand why some countries still resist democracy: our financial system is self-destructing thanks to greed and irresponsibility, our Congress is bickering like bratty children in the backseat of a car only 1/2 an hour into a 12 hour vacation drive, and residents sat through yet another 2 hour meeting on the proposed Army base in Middletown.

OK, maybe the last thing on my list doesn't fully compare with the first two, but I will admit that the process of democracy is challenging, tiring and frustrating. The complete transcript of tonight's meeting should be available in about ten days on the Army COE's website. (Check here.) Here's some general comments about how that went:

Deputy District Commander, David Dale, opened the meeting with a review of the project timeline. The public comment period for the 4 site finalists (Cucia Park, Bysiewicz Industrial Park, Ken Dooley/Boardman Lane, Mile Lane) ended today. The Army will rank these four sites in order of preference to create a Site Identification Report that will be forwarded for approval by 17 October. By October 30th, this list of sites will be approved, and the NEPA process will begin for each site. In early November, the Army will release the site rank order, but this preference listing doesn't mean that the #1 site on the list has been chosen at that time. By March 2009, the contract will be ready for advertisement, with the contract award happening by June 2009. Occupancy is expected by March 2011.

This timeline didn't spell out specifically the actual date by which the final choice will be made, so that detail remains unknown for now, and that's the source of my frustration. But, I'll get to that in a minute...

The comment portion of the meeting was to gather any missed information the Army didn't receive via its blog. The Army's summary of the key comments posted on the blog for each site:

Bysiewicz Industrial Park:
  • Loss of tax revenue for the city
  • concern over wetlands
  • increased traffic
  • approved industrial development
  • strain on local utilities
  • site has been cleared

Cucia Park:

  • Loss of park, open space, wildlife habitat
  • no loss of tax revenue
  • zoned industrial, surrounded by industrial use
  • good access to 91
  • revenue to City for sale of property
  • public support
  • impact on neighborhood

Ken Dooley/Boardman Lane:

  • loss of tax revenue
  • wetlands
  • increased traffic on residential streets
  • blasting
  • strain on utilities
  • City Resolution
  • public opposition
  • zoned industrial

Mile Lane:

  • Government owned
  • no tax loss
  • contaminated site
  • increased traffic
  • near schools/residences
  • city has interest in redevelopment

After this basic summary of the feedback each site has received, residents were able to comment on each site. These comments were videotaped and also annotated by a court reporter for inclusion in the official record.

The only comment on the Bysiewicz Industrial Park was from the owner of the brick home that would be surrounded on 3 sides by the base: he will offer his home for sale to the Army should this site be chosen. (This house would make a stately home for the Base Commanding Officer, so I recommend that he hold out for top dollar should it come to that...)

Several residents from Smith Street and the Westlake area made surprisingly strong comments AGAINST the use of Cucia Park. Most of the comments referenced how nice the park used to be and chided the city for not taking care of it. Councilman Klattenberg clarified that Cucia Park is actually about 4.4 acres contiguous to about 36 acres of abandoned industrial land (a former brick yard). The Mayor's Advisory Panel already inquired about preserving public access to the pond, and the Army has promised to take that under consideration.

Stephen Devoto, on behalf of the Westfield Residents Association, spoke specifically about the 3 possible sites that are in Westfield (KD/Boardman Lane, Bysiewicz Industrial Park, and Cucia Park). Ranking Cucia Park as the best choice, Devoto stated that the WRA is not thrilled about the city selling a park. However, given the extreme circumstances (and the fact that the Army SHOULDN'T be looking for land in Middletown ever again) the use of Cucia Park brings the most benefit to the city with the least amount of harm to residential neighborhoods. Devoto also commented that WRA's passionate involvement in the site selection process doesn't come from NIMBY (not in my backyard) concerns: rather, the passion comes from the abundance of analysis that the WRA has conducted since June, and the conviction that IF the Army has to build in Middletown, it should value above all else what the town thinks is the best site.

Mayor Guiliano spoke plainly and simply about the KD/Boardman Lane and Cucia Park sites. He asked the audience to consider for a moment that a private developer had submitted the Army's plans: in the case of Boardman Lane, the Mayor was "pretty confident" that those plans would be denied, just as he was confident that the same plans for Cucia Park would be approved. Guiliano told the Army to keep in mind that the Boardman Lane/KD site asked the city to accept something it wouldn't accept from any private entity. (Way to go, Mayor!!!)

After other comments on public safety issues, traffic concerns, and the danger of a schedule determining the sites available for consideration, Councilman Klattenberg mentioned that the Common Council will be taking up a resolution at its next meeting (Monday, October 6th) that endorses the use of Cucia Park and directs the City's Economic Development Commission to begin the process to dispose of the property as necessary. The Councilman also compared the Army's "open and collaborative" process to a funny joke about a neighbor listening to a husband and wife argue. At a point late in the evening, the arguing suddenly stopped, and when the neighbor later asked the wife what happened, she replied that her husband had agreed to a compromise: he agreed with her position.

That's where I'm at. I'm ready for the Army to catch a clue and to agree with the town's position on Cucia Park. David Dale's response to Councilman Klattneberg's comments was a polite "thank you for your comments" response, but I really wanted a simple "Yes, Dear." Of course I understand why he couldn't say that, but I'm ready to move on to other things (like maybe the bus issue and how the Board of Education has rocks for brains when it comes to imagining what parents are going through because of the new busing policy...oh, wait, that's something for another time...).

A brief on-the-way-out-the-door conversation with the Army's architect enlightened my suffering in a way I hadn't considered before. Until the NEPA process kicks in for the 4 sites (that's about the beginning of November), the Army is only about cost, engineering considerations and site availability. The public passion for or against a particular site doesn't come to bear on the decision making process UNTIL the NEPA considerations are factored in.

Wait for it...yes...read those two sentences again...yes, I can see the light bulb turning on above your head. If all the public comments for or against a specific side aren't evaluated and factored into the selection process until NOVEMBER at the earliest, what on earth have we been doing for the last 3 months? I was assured that the public comments made on the blog and recorded during tonight's meeting are now part of the official "stuff" that will be looked at during the NEPA review, so yeah for everyone who took the time to give their opinions. However, I was under the impression that since so many of us (elected officials too) have been saying the same thing for so long, that the sustained and vigorous protest against the Boardman Lane site (no matter how you access it) would have affected the narrowing process that whittled 16 sites down to 4. But no. I was wrong. The only factors that appear to have caused properties to fall out of contention were cost-related - both time and money. A perfect site may have been dropped because it was too costly to develop or because it would take to long to figure out how to develop it. Meanwhile, a perfectly horrible site is preserved just because guestimated engineering costs fall within the allowed budget.

Yes, I do understand this is the real world, and that the ideal isn't always possible. However, as the presidential candidates keep reminding us, Main Street is supposed to matter. We the people gave our government the power it needs to function, we the people pay for that functioning, and we the people ought to BENEFIT from that functioning. Abraham Lincoln said that the "legitimate object of governments is to do for a community of people, whatever they need to have done, but cannot do at all or cannot, so well do for themselves - in their separate and individual capacities." As a nation, we've agreed to separate that doing into local, state and federal responsibilities, and I don't think anyone is challenging the basic need for an Army Reserve Training Center. But in THIS case, THIS community of people CAN decide what needs to be done, and the federal government ought to take heed. Our federal tax dollars will pay for this new facility, and how rude it will be to suffer a site chosen despite strong and sustained resident and local elected officials' opposition.

So, the end really isn't the end yet. The public comment period for the site selection list is closed, but we learned tonight that what REALLY counts is the 30 day public comment period on the NEPA process/results. That won't start until at least November. Right. See what I mean about tiring and exhausting? Just as Christmas is approaching, and I'm betting that this holiday season will be hard for a lot of families, we still won't have resolved the issue of where this base is supposed to go. Maybe I'll start on an updated version of the Grinch who stole Christmas...

Thursday, September 18, 2008

A good site selection by the army.


News and Commentary.
by
fishmuscle

The army, taking a page from the Middletown Eye, has established a community newsblog. In addition to being a repository of information (via army postings), it is a major mechanism for Middletown community members to provide feedback to the army (via our comments). All comments posted on the blog will automatically go in the report submitted by the Corps to the Army Reserve around October 1st. Project Manager Diane McCartin explained to me this morning that she deliberately turned to a blog hosting service external to the army's domain, because everything posted on the army's internal servers requires extensive moderating and filtering to remove threatening language and to ensure that there are no security risks. Ms. McCartin did not want to filter postings or emails, and she wanted to ensure complete transparency, to assure residents that their comments would be included. This idea, using an external blog hosting server, is not something that has been done before in the Louisville District of the Corps of Engineers.

The comments section is divided into 5 parts, one for each of the possible sites, and one for general comments (clicking on each of the following will take you right to that comment section):
Ms. McCartin emphasized to me that all comments are welcomed, both positive and negative. She suggested that negative comments about Boardman Lane would not be as helpful to the process as positive comments about other sites, saying, "I've heard lots of comments about Boardman Lane. I'm a pretty intuitive person, and I get it that Boardman is not y'all's favorite site." Ms. McCartin acknowledged that there is a danger that unfiltered blog postings might have problems of their own, but she feels that transparency is too important to sacrifice.

Commentary
The army has finally done something right in the area of site selection. This new website is elegant, intuitive, and transparent, it is an outstanding means for gathering and organizing community input. The Army should take full advantage of this site and greatly expand the information available. They have given themselves an opportunity to show with their actions the openness of the process. On this site should be maps of each parcel, information about environmental, engineering, traffic, etc issues relating to each site, and schematics of how the army would place its buildings. The army should post here all other information that residents have asked for, including information that they have previously denied to us. The links should be expanded, there is a link to
the City's Army information clearinghouse, but they should also link to other Middletown websites that have featured information (the WRA website, and hey Ms. McCartin, how about a nod to THE MIDDLETOWN EYE?).

The open nature of the blog postings has the very important ancillary benefit that Middletown's citizens can learn from and respond to what others in the community are thinking. It will not bring us to the level of democracy and discussion enjoyed by those in Vermont who attend the famous "town meetings", but it can bring us much closer than Middletown has been in a very long time. If the blog postings get out of hand, the Army should ask individuals trusted by the community to apply a minimal filter. All comments should be accessible to anybody who wants to read them, but the on-topic comments should not be made irrelevant by being buried in a swamp of off-topic comments.

Our elected officials should use this forum with us, to make clear their opinions on each of the 4 sites and on the entire site selection process in general. The army has given our Mayor, our Common Council members, and our state and federal elected officials an opportunity for them to show their constituents that they are engaged in the issue of the Military Reserve Center in Middletown. All should take advantage.

Monday, September 8, 2008

Cucia Park

News and questions.
by Stephen Devoto

On Friday, the city announced that it would offer Cucia Park to the Army as a potential site for the military training facility in Middletown. This decision followed preliminary discussions by the advisory panel convened by Mayor Giuliano to represent the interests of the non-federal stake-holders during the Army's site selection process.

Cucia Park is one of two developed parks in the Westfield section of Middletown. Cucia Park consists of about 40 acres on Smith Street (no relation to Smith Park), bordered by developed industrial land on three sides and by I91 on the fourth. It is about 3 blocks from Boardman Lane, in fact at their closest they are only 1000 feet apart.
However, the Boardman Lane site that was chosen by the army is in a different world from Cucia Park. Whereas the Boardman Lane site is on a small country lane and bordered by houses and farms, Cucia park is on a very wide road and embedded within very developed Industrial lots. Here is a link to a parcel map.

I visited Cucia Park on Friday morning between 7:30 and 9:00, to see what Middletown might be giving up. The intersection of Smith Street and Miner Street is near the center of old Westfield. The Westfield cemetery is across the street, the 3rd Congregational Church is one block away, and the Westfield Fire Department (built on the site of the old Westfield School) is only two blocks away. Smith Street curves down under I91, and in less than half a mile changes from charming residential to completely industrial as it approaches I91. Large manufacturing and engineering companies have their warehouses on Smith Street and Industrial Park Road (which intersects Smith). The entrance to Cucia is across the street from Industrial Park Road. The land was purchased by the city fr
om a brick manufacturing company in 1974, and dedicated as a park in 1975.

Cucia has about 3 acres of developed land, with mowed grass under pine trees, surrounding a pond. Several picnic tables overlook the pond. I locked my bicycle to a tree in the gravel parking area, and picked one of several well-worn trails leading from there into the brush. These trails unfortunately all are less than 50 yards long, they typically end in a small flat area that would be scenic if it weren't for the abundant trash from fast-food restaurants strewn nearby. I could find no trails that penetrated into the heart of the park, so I pushed my way through the brambles, following an old raised bit of land where there used to be rail tracks. The eastern half of the park is a gentle slope from Interstate 91 down to a flat area that is largely covered with vines and small trees. The flat area is pockmarked with old excavations, some abandoned culverts litter the forest floor, and there is extensive erosion. Presumably these excavations and the two ponds on the property result from the removal of clay for brick manufacture. At the southern border of the park are two parallel tracks of the large power lines. The sounds of I91 drift down the slope and permeate the park, it's not quite as loud as at an interstate rest area, but it is pretty close.

When I returned to the grassy area after fighting my way through the brush, I joined Allen Ahalt, who regularly comes to the park to photograph wildlife. I asked him about other people who make use of the park. He mentioned that at lunch time there are a few people who walk over from the Industrial Park to have lunch on the benches. He said that there were also a lot of people who drive in to the park and "sit in their cars reading a book". I looked up and noticed that while we had been talking
, someone had driven in to do just that, sitting in a minivan facing towards us and the pond. Mr. Ahalt and I chatted for quite awhile about all the animals he's photographed at the park (he showed me a gorgeous picture of an American Bittern fishing in the pond). I then headed up to the parking area to get my bicycle, passing by the reader in the minivan. As I came closer, the van's headlights went on and off as if inviting me to share in something. I smiled and waved. I did not see a book in his lap, and I did not feel comfortable stopping for a chat. In any case I was running late for work, so I got on my bicycle and headed into town.

The possibility that the city might transfer Cucia Park to the army raises many challenging questions for the city's residents to consider. Fortunately, these are not global questions of city policy, but rather questions pertinent to this one unique situation. The requirement to find open space that can be taken off the tax rolls and used by the U.S. Army will not come up again. This does not necessarily make the questions easy, but at least the City does not have to establish a permanent policy on finding large tracts of land for the army.
  1. Who determines the value of city-owned open space?
  2. Can the city sell its open space if the conditions are right?
  3. If so, what are those conditions?
  4. If money is involved, what should the city do with this money?
Listening to the mayor's advisory panel is one of the ways by which the Army is going to demonstrate that this new site selection is proceeding in an "open and collaborative" manner. The panel consists of Hugh Cox (jdycox@comcast.net), Stephen Devoto (dermomyotome@gmail.com), Ron Klattenberg (r.klattenberg@sbcglobal.net), Nancy Newman (nancynewmanre@aol.com), Phil Pessina (ppessina@sbcglobal.net), Bryan Pollard, and Arline Rich (akrich@att.net).

Citizens who are concerned about anything related to the Middletown Military Training Facility, including the possible transfer of Cucia Park to the Army, can address their questions and concerns to any member of the advisory panel, to Bill Warner (Middletown Planning and Zoning: Bill.Warner@cityofmiddletown.com), or to Todd Hornback (army press official: todd.j.hornback@usace.army.mil).

Friday, September 5, 2008

Cucia park for the army?


An announcement from the City, analysis and commentary to follow later:

The City of Middletown is pleased to announce that it has offered to the Army the sale of the city-owned Cucia Park as a site for the Army Training Facility. The City believes this site has enormous potential.

CUCIA PARK
1. The site is located on Smith Street at the southern end of Industrial Park Road. The land was acquired in the 1960s for economic development from the MacDonnell Brick Company. The total park area is 36 acres.

2. Cucia Park is bounded by Rte 91 (east), Smith St. (north), industrial development (west) and a CL&P transmission line (south). The park is zoned industrial and the Army facility traffic will not travel through residential neighborhoods. The park has I-91 access from both the north and south. Travel to the site is by way of I-91, Exit 21, Industrial Park Road(north), I-91, Exit 20, Middle St (south). The site is located on an existing bus route.

3. Cucia Park has fallen into disrepair and limited community use because of its isolated location and overgrowth.

4. The site is located in an industrial area where water and sewer lines are adjacent to the property.

5. The CT Department of Environmental Protection Natural Diversity Database does not show any species of special concern present at or near the site. The site does have some areas of erosion due to storm water runoff from I-91. The site has two ponds and a stream that runs parallel along the west side of the property. The ponds and stream will add significantly to the aesthetic setting of the site plan.

6. The site is sloped toward the eastern end of the property. The steepest portion of the slope is near I-91.

7. The Westfield Fire Department and State of Connecticut Public Safety complex are both in close proximity to the site.

CITY - ARMY PARTNERSHIP
The Mayor and advisory panel believe Cucia Park offers enormous potential for the Army and city residents. The advisory panel continues to evaluate five (5) potential sites (Pratt and Whitney, CL&P at River Road, Manthay Property, Bysiewicz Property, Cucia Park) but believes Cucia Park is unique because of its location. The City will work expeditiously to move the process of site identification forward quickly to meet the Army's deadlines for identification of potential sites, public outreach and necessary approvals. We are excited about the working relationship between the Mayor, the advisory panel and Army. The Army appreciates the suggestions and input they've received from the Mayor's advisory panel and the community. The next public meeting is planned for 17 September 2008, at a location to be determined, which the Army will publicize in The Middletown Press and The Middletown Eye.

Tuesday, August 26, 2008

Trust, but Verify

Commentary, by fishmuscle

The army is beginning a new and improved site selection process this week, for a training facility which will need only about 25 acres, instead of the 45 acres needed earlier.  Colonel Landry, in his visit to Middletown last week, promised that this would be an open and collaborative site selection process. According to the Army's latest announcement of this week's meeting (Wednesday, 7PM, Mercy High):
The Army is requesting site suggestions from community members, city officials and state agencies. The U.S. Army Corps of Engineers website will accept site recommendations for the project. 
The Army is asking community members to recommend sites and comment by Sept. 29.
This is an encouraging change from the two previous site selections, which ended in failure. The citizens of our city should trust the Colonel's word that under his new leadership, we will not be subjected to another closed and uncooperative site selection process.  We should trust that this time, the community will be a partner with the army in choosing a site that is best for the Military and Middletown.  We should trust, but we should verify that his actions reflect his words. 

The smaller size requirement for the training facility site now opens up many more possibilities in Middletown.  The image above shows in blue all of the parcels of greater than 25 acres. Although most of these are likely not for sale and/or unsuitable for a training facility, large lots are found throughout town.  All of Middletown's neighborhoods need to be engaged from the start of this new site selection process. Community members should offer suggestions and advice to the Army as they decide what to do with our community's land.  It is then up to the Army to demonstrate that this community input is given serious consideration as they move forward.  

Come to the Public Hearing this Wednesday at 7:00, at Mercy High School, 1740 Randolph Road.
At Wednesday's meeting will be Mr. David Dale, top civilian in the Louisville District of the Army Corps of Engineers, and Diane McCartin, Middletown project manager. State Rep. Ray Kalinowski will be the moderator of the meeting. Mr. Dale will give the Corps' presentation, in which he will present the revised acreage requirements, the new project timeline, and the new site identification process. There will then be a Q&A opportunity for the public.

Monday, August 25, 2008

The week ahead: 8/25 to 9/1

Welcome new Wesleyan students!
Tuesday, all over town
Dazed and confused 18 year olds, accompanied by wistful parents, descend on our city.  The former will begin their transformation into confident Middletown residents, the latter will head back home with tears of relief and sadness in their eyes.  

There are two public meetings this week. Both are about land use in Middletown, and both are happening on Wednesday at 7:00 PM. The P&Z meeting has been scheduled for months, and includes a public hearing that could not be rescheduled on short notice.  Thus, the Planning and Zoning elected commissioners and the Planning and Zoning city staff will not be able to attend the Army hearing. 

Planning and Zoning Commission

Wednesday, August 27, 2008- 7:00pm - Council Chambers
  • Public Hearing- Proposed four (4) lot resubdivision of the property of Stephen G. and Barbara Borrelli located on Fairchild Road at the end of the cul-de-sac and adjacent to the Cavalry Cemetery to be known as Borrelli Acres.
  • Public Hearing- Proposed Special Exception to construct fifteen (15) multi-family dwellings on the east side of Jackson Street adjacent to Newfield Street (Rt. 3) to be known as Acheson Woods II.
  • Request for reduction of the cash bond for the Arbutus Estates Subdivision located at 1111 Arbutus Street.
  • Request for reduction of the cash bond for the Liberty Hill Subdivision located off Plumb Road.
  • Request for G.S. 8-24 Review for the purchase of 131 and 155 Wadsworth Street by the city from the State of CT Department of Children and Families.

Armed Forces Reserve Training Facility
Wednesday, August 27, 2008 - 7:00
Mercy High School Auditorium, 1740 Randolph Road
This meeting will be moderated by State Legislator Ray Kalinowski. It will be a public hearing, members of the public are invited to speak regarding the proposed training facility.

Friday, August 22, 2008

Corps Starts Again--Hartford Courant Editorial

Today's Hartford Courant lead editorial (I've only changed the formatting)

Officials of the U.S. Army Corps of Engineers said this week that they would reopen the site selection process for a new regional Army training facility and promised to keep citizens and local officials better advised about the project's progress. Both are welcome developments.

In the interests of time and money — and avoiding public angst — we urge the Corps to go further, to wit:
  • Expand the search to sites outside Middletown. Col. Keith Landry, who is overseeing construction for the Corps, says Army lawyers interpret the federal law calling for the consolidation of Connecticut's Army bases to mean that the new base must be in Middletown. But that is an unnecessarily narrow reading of the legislation. The law stipulates the base should be located in Middletown if a suitable site can be found. That language clearly gives the Army some flexibility.
  • Consider brownfields. Army officials have ruled out abandoned industrial sites, saying they're too expensive to clean and develop. But former industrial sites can offer several advantages, including proximity to downtowns, transportation corridors, water systems and sewer lines.  By adopting a policy of reviving brownfields, the Corps would be working against sprawl and helping to preserve open space, an increasingly precious commodity in New England. Also, the state's brownfield remediation program could be used to clean a potential site for the training center. 
  • Heed the advice of state and local officials and citizens. In the past eight months, Corps officials have selected two sites. Both met strong opposition from neighbors and public officials. Corps officials deserve some credit for agreeing to step back from their plans, and for promising to keep the public better informed from now on. But they also need to listen and allow their selection of a site to be informed by the community.
  • Respect the authority of the local inland wetlands agency. This is a corollary to good listening. Corps officials appear to be balking at the notion of submitting their site plans to a local wetlands panel for approval. By going through the application process, however, Corps officials will be ensuring that the development of a new training facility is shaped by local priorities and concerns.
Corps officials say they're under a tight schedule for building this regional training facility. By listening and working more closely with the community, however, we suspect the Corps will enjoy a smoother, less troublesome site selection process.
Corps officials have tried it their way for the past eight months, only to end up almost where they started. It's time they tried a different approach.

Wednesday, August 20, 2008

Army apologizes and welcomes more public comment for its "new" site selection process


Once again, the Army Corps of Engineers is restarting the site selection process for the new Army Reserve Training Center it says must be built in Middletown. Col. Landry (District Commander, Army Corps of Engineers) and his project team were in town to apologize for the negative perceptions created by the Army’s July 31st press-only news conference, and to explain the new process the Corps wants to implement as it searches again for a “suitable” site in Middletown.

The cast of elected officials in attendance was impressively large: the Mayor and Common Council members, Congresswoman DeLauro, Secretary of State Bysiewicz, Attorney General Blumenthal, State Senator Doyle, and State Representatives Hamm and Kalinowski, to name a few. Senators Dodd and Lieberman sent staffers, and it was almost funny to watch everyone try to find a seat in the cushy chairs at the front of the Council Chambers.

It was NOT funny to be Col. Landry: he was in the proverbial hot seat, and to some extent, he took responsibility for a lot of things he had no control over. He’s been the District Commander for all of two months, which means he was coming to a new job just as the Corps announced the selection of Boardman Lane as the “preferred site.” Unfortunately for him, once you’re in charge, you get stuck with whatever your predecessor left you. In this case, he got handed a project in a town already riled up about the initial site selection in Maromas, with a Mayor and Common Council miffed about the Army’s perceived lack of cooperation in the site selection process.

So, as the meeting unfolded, Col. Landry was stuck literally between a rock and a hard place: he stood at the podium, facing a slew of elected officials and their questions, with a full audience of concerned residents and press members bringing up the rear. It is important to note that some sort of private meeting occurred BEFORE all the players made their way into the Council Chambers, so I can only assume that no one was totally blindsided by the questions or answers that came out during the more public gathering.

The Col. started his remarks with a list of reasons for his trip up from Louisville: mainly, that General Peabody (his boss) couldn’t come, and the July 31st press-only conference was “not the wisest thing to do.” Col. Landry took full responsibility for the “negative perceptions” created by that press conference, and stated forcefully that the Army doesn’t normally conduct business that way. He then explained that he was proposing a new, more transparent site selection process that would include more opportunities for public comment earlier in the process. Finally, he revealed that he received new orders on August 18th to construct a smaller facility (this due to Governor Rell reducing the number of units relocating to the new facility), and that the site selection process would begin over again since less total acreage was needed (he did not yet know the new acreage criteria). He ended with another apology for any hard feelings created and stated that he wanted to do his best to satisfy ALL the target audiences: the public, the town, the BRAC legislation, and, of course, the Army’s needs for training and national security.

Councilman Ron Klattenberg asked the first series of questions, going straight to the heart of the controversy: has there been a legal determination on whether or not the reserve center MUST be built in Middletown? If so, is that opinion available to the town or state’s legal resources for review? Col. Landry’s reply: having spoken to his lawyer before he left, the Army reads the BRAC language to mean within the city limits of Middletown. Councilman Klattenberg then asked what happens if no suitable land is found? The reply: the project doesn’t get built and the citizen-soldiers in CT lose out on a new, modern facility. Other information from this line of questioning: the original programmed amount (meaning how much money had been budgeted) was $68 million, but since the project scope has been reduced, the programmed amount will be as well. Col. Landry did say that brownfields could be considered as potential sites as long as his budget could handle the site purchase price, clean-up cost AND building cost (this is new…more on this later).

Congresswoman DeLauro and Attorney General Blumenthal jumped in next, specifically disagreeing with the Army’s interpretation of the “if the Army is able to acquire land suitable” BRAC language. The Congresswoman was unhappy with the “build it in Middletown or nowhere” answer, and the Attorney General repeated his concerns with the legal violations he says the Army committed in selecting the Boardman Lane site. The Col.’s reply: all concerns get looked at in great detail, we (the Army) hadn’t reached the stage of the process where those concerns are specifically dealt with, and “we will do everything we’re required to do by law.”

The Attorney General, not satisfied with that answer, commented that the timing of the particular steps was important, and he hoped that the Army “wouldn’t make that mistake again” (meaning that it wouldn’t pre-select a site without considering the various legal issues involved – the National Environmental Policy Act, the Clean Water Act, historical significance, etc.) Col. Landry replied that he didn’t think the Army made any mistakes, again stating that the Army had been in the process of reviewing all those concerns for the Boardman Lane property when the Governor changed the project scope.

Secretary of State Susan Bysiewicz spoke next, stating that the heart of the matter was a quick and definitive answer to the “does it have to be in Middletown” question. She worried over wasting everyone’s time, and pushed for the combination of organized resident groups’ input, the Governor’s leadership as the Commander-in-Chief, and the town’s preferences as the Army’s guiding principles for the next site selection process. Col. Landry replied that he had marching orders to build in Middletown, and that if he considered anything else (without authorization from his boss), he wouldn’t be doing his job. He committed to being “totally transparent to the community” to “find a site that the community is happy with and that the Army is happy with.”

State Representative Gail Hamm then asked what “cooperate with the city” really meant. Col. Landry replied by briefly explaining the site selection process: the Army Reserve says it needs a facility in a specific location to accommodate such-in-such, that requirement is passed to the Louisville Command, and they check their manuals for specific site requirements. The Louisville Command then identifies all properties that meet the following criteria: 1) is the property within the required geographical area, 2) is there suitable buildable acreage, and 3) is the property available for purchase. After a list of properties is complied that meets those 3 criteria, each property is considered more carefully (some properties may fall off the list during this process), and a rank ordered list of properties is generated. The Reserve Headquarters then evaluates and approves this list, and it’s sent back to Louisville (and the Mobile Command, which does the environmental investigations) for NEPA (National Environmental Policy Act) analysis. If this analysis finds something that can’t be mitigated, the property falls off the list.
Representative Hamm interrupted this explanation to ask who gets to decide what “suitable” means? The answer: the Army does. Col. Landry went on to say that if a 2nd legal opinion determines the process can look OUTSIDE Middletown, he’ll do that once he gets new marching orders, and he hopes he would have the time to do this (he has to have a site selected by the end of October). Col. Landry also stated that he wants to start a new process to gather input/citizen feedback on the properties on the list AS those properties are on the list (not just at the end when one property is selected).

Rep. Hamm, clearly agitated, asked if this new process meant that the Maromas properties were back on the table. She was distressed that all the work in February and March to exclude those properties was all for naught, and she accused the city of taking the position that it wanted Maromas developed, so that’s where the city would direct the Army to look again. Councilman Gerald Daley interrupted her to say that she didn’t represent the city’s position, that the city had clearly outlined that position in the August 4th resolution, and what he wanted to know was whether or not the Army was subject to the Inland Wetlands Commission. The reply: that’s in a pending review, we’ll let you know. Attorney General Blumenthal jumped in immediately to comment that the State’s position was that the Inland Wetlands Commission has jurisdiction and that he would use legal action if necessary to ensure that review happened. He also stated that the Army needed a permit under section 401 of the Clean Water Act, and that previous Army statements had been interpreted to mean the Army wasn’t going to follow this requirement.

By now, Col. Landry was a little red in the face, and he responded to the Attorney General by telling him that he (Col. Landry) had been an Eagle Scout and is a “principled steward of the environment.” He insisted that he would “do everything the Army legal section tells him to do” and that he would follow all applicable federal laws.

The discussion then came back to the Freeman Road site, and it was determined that property would not be under consideration again because there was not a willing seller (remember the 3 initial criteria, and that the State has first right of refusal on the property if it goes up for sale).

Councilman James Streeto asked if the Col. had seen the Council’s August 4th resolution, the Col. said no, and the Councilman gave him a copy so the Army would know the town’s concerns over the Boardman Lane property. Councilman Grady Faulkner asked if the city would get better notification of the Army’s specific plans this time around, and Diane McCartin (the project manager) replied that there would be public comment earlier in the process. There were several quick questions about what would be on the base besides classroom facilities, and the answers: no live ammo, no weapons, no helicopter pad requirement, and some maintenance facilities for vehicles.

State Senator Paul Doyle then thanked Col. Landry for the previous day’s phone call apology (supposedly for shutting Doyle out of the July 31 press conference – remember that Doyle had called for an investigation to look into that incident). Senator Doyle said he’s taking the Col. at his word that more public comment would be considered, and that the mayor and city building department would be specifically involved.

Councilman Philip Pessina commented next that Middletown is a close knit community with high sensitivity to what happens to its property. Pessina reiterated his desire for an open process, effective communication between the Army and the city, and the Army’s careful consideration of citizen’s concerns.
Councilman Vincent Loffredo then read to Col. Landry the November 16, 2006, letter from Mr. Redlinger (the Army’s Real Estate person, who happened to be in the room) that asked the Mayor about properties in or within 20 driving miles of Middletown for a new reserve center. The letter also commented that the Army planned to ask the State of CT for other possible properties that could be used. Councilman Loffredo called this letter “shocking and disturbing” given the Army’s current position that the base MUST be in Middletown. Col. Landry responded with “I feel like my personal integrity was just insulted,” and Mayor Guiliano had to step in and “save” the Col. from the ensuring verbal scuffle. Councilman Loffredo explained he wasn’t trying to attack the Col., rather he (the Councilman) just wanted to clue the Col. in about the existence of the letter so there could be an explanation of why the Army’s position had changed. There was a brief flurry of consultation between the Army personnel, and Mr. Redlinger’s response was that the letter had been written BEFORE the Army lawyers gave their ruling that the site HAD to be WITHIN Middletown’s city limits.

Councilman David Bauer then asked that all public documents relating to the site selection process be forwarded for inclusion on the city’s special project website (no problem for the Army). Representative Kalinowski confirmed the August 27th public meeting is still happening and that the discussion would no longer center on Boardman Lane solely as the preferred site (the Col. agreed and stated that he should have the new acreage requirements by then). Councilman Earle Roberts said he’s looking forward to future discussions as the new process unfolds.

Then the Mayor introduced several key citizens and city officials sitting in the audience (Arlene Rich, Chairperson of the Westfield Residents Association; Katchen Coley, Environmentalist, Bill Warner, City Planning, Conservation + Development, Catherine Johnson, City Planner, and a few others) and noted these individuals are key resources for the city and should be for the Army as well. Mayor Guiliano closed with the prize-winning statement of the evening: “Had everyone stayed in contact with the Planning Department, you wouldn’t have stepped on some of the landmines you did.” Col. Landry could only reply that having been a combat engineer in Iraq, he knew exactly what the Mayor meant, and he appreciated the metaphor.

Thus the meeting adjourned and the press swarmed in and the whole thing was over.

Well, it’s not really over, is it? Sorry that the “play-by-play” summary was so long, but I thought it important to be as detailed as possible so you can’t accuse me of coming to conclusions not supported by the actual events. What are those conclusions? Well, it depends on whose perspective you care about…

From the Army’s perspective, the meeting was a chance to apologize and to explain what the “new” site selection process would be. OK, apology accepted. But, the only “new” part of the process was the promise to let the public comment on ALL the properties on the selection list as that list is being generated. The process itself is the same, and the Army is still saying it doesn’t investigate NEPA, historical and other legal concerns until one or two properties have been decided on. This timing is exactly what the Attorney General has problems with, and so it seems that issue remains a problem. And really, what does “public comment” mean for the process itself? Is this a nice way of saying the Army is listening to, but not hearing, resident concerns? Is it ever possible that public comment results in a property falling off the list?

From the town’s perspective, the Army has stated publicly that it is starting the site selection process again because the acreage criterion has been reduced. This means other properties not initially considered could now be considered, and the Mayor made sure to say that he expects the Army to work close with Bill Warner to select suitable sites (there’s that pesky word again…).

From the gaggle of other elected officials’ perspectives, everyone had a chance to raise specific constituent concerns, and I did get the sense that each official was personally interested, and not just grandstanding for the media or the 100+ residents sitting in the audience.

From the concerned resident’s position (that’s me, my neighbors, the Maromas neighborhood, etc.), I can’t say definitively that Maromas AND Boardman Lane are now safe. In fact, I fear the opposite is true. Col. Landry casually mentioned at one point that he has to do some environmental investigations on the Boardman Lane property BEFORE winter (and the box turtles become too hard to find…), so he’d be kind enough to let us know when personnel would be tromping around, looking for said turtles as well as sedge plants (both are species of concern on CT’s Natural Diversity Database). If the Army really is starting the selection process over again, why continue the in-depth study of the Boardman Lane property? If the acreage requirement has been reduced substantially, why waste federal funds on 88 acres if the Army doesn’t need but 20 or 25 acres?

Under direct questioning from Congresswoman DeLauro, who was reading from the Army’s own technical letter number 1110-3-49, Col. Landry agreed that Army policy directed him to “leave pristine areas untouched and minimize disturbance to wildlife habits,” to “give priority to and build on previously disturbed or damaged sites, and, where possible, restore damaged areas…” This would suggest a couple of things: first, the Army should RUN AWAY AS FAST AS IT CAN from pristine sites like Boardman Lane and Maromas JUST BECAUSE those areas are pristine, environmentally and historically important, and clearly not sites supported by the city’s elected officials. Don’t talk to me about whether those issues can be “mitigated” or not: the box turtle doesn’t want to hear that his preferred home can be moved just because some lawyer says so, and the 100+ homeowners within 2000’ of the proposed blasting zone on the Boardman Lane property don’t want to find out that “mitigate” means “sorry, we cracked your foundations and ruined your wells, oops.”

Secondly, the Army should jump at the chance to work with Governor Rell’s Office of Responsible Growth, as Secretary of State Bysiewicz has championed, especially if there might be state funds available to help with site cleanup (this would leave more money in the Army’s budget to purchase and build than if the Army also had to pay cleanup costs). So why, then, is the Army sticking stubbornly to the “must build in Middletown” mantra, and what is taking the legal review so long to come back? Who is going to be offended and sue if the site ISN’T in Middletown? Why can’t Governor Rell insist that the Army, the Justice Department and whatever other necessary entities figure this out, like, I don’t know, THIS WEEK, so we can all get on with whatever it is we’re doing?

Finally, I shudder to think that the Army really expects us to heed its threat to cancel the whole project if “suitable” land can’t be found in Middletown. Since when does the Federal Government NOT spend funds it ALREADY HAS to spend? We all know about the general willingness to spend money it DOESN’T have, so really, be serious. The clear path to finding a “suitable site,” and let’s agree that suitable means the site makes sense for ALL parties concerned (the city, the city residents, business interests, the Army’s interests, the box turtles’ interests…), is to quit arguing over the BRAC wording, let the newly proposed “task force” comprised of key Middletown citizens and city officials evaluate the possible sites based on the new acreage criterion, and then let the Army consider ONLY those properties. If the Army doesn’t like any of those choices, it can then work with Governor Rell’s office (who should by that time have her OWN possible statewide list) to consider additional sites outside of Middletown.

It’s August 20th, and there are 72 days left until Col. Landry’s supposed end-of-October deadline for site selection. If done correctly, there will be no need for in-depth environmental or historical studies because the “preferred site” won’t have any of those problems to begin with, and the pesky city residents (proud to be the “land mines” Mayor Guiliano referred to) will smile happily and boast patriotically about the new Army Reserve Training Center coming to their town.